PROJECT TEAM

Management
Florida Department of Transportation

Contractor
The Lane Construction Corporation

Construction, Engineering and Inspection Consultant
DRMP, Inc.

Public Information
The Valerin Group, Inc.


Your Subtitle text


US 98 SEGMENT 2 - Project Features

US 98 South of Manor Drive to North of CR 540A and
US 98 from Manor Drive to Old Bartow/Eagle Lake Road


Construction on US 98 from south of Manor Drive to north of CR 540-A and US 98, from Manor Drive to Old Bartow/Eagle Lake Road, a distance of 3.7 miles, began in January 2011. This project is anticipated to be complete in fall 2012. To view a copy of the project fact sheet click here.

The improvements included in this project consist of:

  • Widening US 98 to six lanes
  • Removal of old asphalt (milling)
  • Resurfacing the roadway
  • Drainage improvements
  • Street lighting
  • Sidewalk construction 
  • Traffic signals
  • Pavement markings

Night Work:
Night work will take place to perform any roadway construction activity that requires a lane closure.

Lane Closures:
There will be no lane closures permitted between the hours of 6 a.m. and 8 p.m. No lane closures are permitted between the hours of 6 a.m. and 9 p.m. within 600 feet of a signalized intersection.

Speed Limit:
Speed limits will not be reduced during construction.

 

 

 

 

 